Specializing in the transport and lifting of heavy and/or oversize structures
Our Equipment
Other Services
Skid Shoe System
Past Projects
Latest Projects
Home

Tel:
(604) 224-0663

Fax:
(604) 224-0655

Sea Business Ltd. 210-5835 Hampton Pl Vancouver, BC
V6T 2G2, Canada

Email

 

Site Powered by
FeatureWeb

Past Projects

Click here to view these videos of our equipment at work.
For faster viewing "right click" and "save as" to your computers hard drive. Then double click the file and view the video's from your hard drive.

  1. Cape Breton - 8.4 megs
  2. Container Crane - 10 megs
  3. Lions Gate Bridge - 21.1 megs
  4. Pacificat Modules and Loadout - 11.6 megs
  5. Module Handling - 21 megs

Related Links:

www.jensenmaritime.com

www.supremehousemovers.com

www.seabulk.com

Pipe-Rack Module Lifting & Transport


Sea Business designed and built this spreader frame system.

Moving a module clear of Ideal Welders’ assembly shop.
     

Lifting a module to barge deck.
 
Barge loading using Seaspan Foresters’ crane.
     

Landing a module to dolly transport frame.
 
Temporary Dock Arrangement

Cape Breton - Moving the Stern


Start splitting stern module from main hull.

Stern section removed from main hull.
     

Dollies moving onto Ro-Ro bridge.
 
Section moved onto transport barge from floating drydock.
     

Support frame accounts for high centre of gravity.
 
Section moving through shipyard to temporary storage.

 

Lions Gate Bridge


Custom designed transport frame.

Bridge panel blocked and
sea-fastened.
     

Transport frame being positioned below bridge panels.
 
Dolly's hydraulic ram taking the load.
     

Bridge panel moving from storage to barge.
 
Panel moving through Canrons’ yard.
     

Panel supported on dollies and transport frame.

 

 
Panel loaded out onto free-floating barge.
     


Panel stowed on transport barge.

 
Panel being jacked to transport elevation.

 

Container Cranes at Deltaport for
Terminal Systems Inc.


Skid system support under main equalizer.

Skid system pump and control unit.
     

Skid shoe jacks at mid stroke.
 
Cranes passing.

 

Middle Point Coal Terminal


Ro-Ro ramp arrangement during discharge.

Setting the pivot.
     

Completing discharge.
 
Completion of shiploader installation.
     

Setting shiploader over pivot.

 

Sechelt Deep Sea Terminal


Bridge beams supported on dollies.
     

Loadout onto free-floating barge.
 
Bridge beams stowed on barge for voyage from Fraser River to Vancouver Pile Driving, North Vancouver.

 

Crane


Relocating shipyard crane from North Vancouver to Fraser River.

Offloading shipyard crane.

 

Catamaran Loadout and Launching


1400 tonnes loadout from construction yard to free-floating drydock.

Dollies under Starboard Hull
     

Ring module from Vancouver
Shipyards to CFI assembly building.

back to top

Click here to view these videos of our equipment at work.
For faster viewing "right click" and "save as" to your computers hard drive. Then double click the file and view the video's from your hard drive.

  1. Cape Breton - 8.4 megs
  2. Container Crane - 10 megs
  3. Lions gate project - 21.1 megs
  4. Pacificat Modules and Loadout - 11.6 megs
  5. Module Handling - 21 megs

Related Links:

www.jensenmaritime.com

www.supremehousemovers.com

www.seabulk.com

 

*   *