 |
 |
 |
Specializing in the transport and lifting of heavy and/or oversize structures |
|
 |
 |
|
Tel:
(604) 224-0663
Fax:
(604) 224-0655
Sea Business Ltd. 210-5835 Hampton Pl
Vancouver, BC
V6T 2G2,
Canada
Email
Site Powered by
FeatureWeb
|
 |
Past Projects
Click here to view these videos of our equipment at work.
For faster viewing "right click" and "save as" to your computers hard drive. Then double click the file and view the video's from your hard drive.
- Cape
Breton - 8.4 megs
- Container
Crane - 10 megs
- Lions
Gate Bridge - 21.1 megs
- Pacificat
Modules and Loadout - 11.6 megs
- Module Handling
- 21 megs
Related Links:
www.jensenmaritime.com
www.supremehousemovers.com
www.seabulk.com
Pipe-Rack Module Lifting & Transport

Sea Business designed and built this spreader frame system. |
 |

Moving a module clear of Ideal Welders’ assembly shop. |
| |
|
|

Lifting a module to barge deck. |
|

Barge loading using Seaspan Foresters’ crane. |
| |
|
|

Landing a module to dolly transport frame.
|
|

Temporary Dock Arrangement |
Cape Breton - Moving the Stern

Start splitting stern module from main hull. |
 |

Stern section removed from main hull. |
| |
|
|

Dollies moving onto Ro-Ro bridge. |
|

Section moved onto transport barge from floating drydock. |
| |
|
|

Support frame accounts for high centre of gravity.
|
|

Section moving through shipyard to temporary storage. |
Lions Gate Bridge
Container Cranes at Deltaport for
Terminal Systems Inc.

Skid system support under main equalizer. |
 |

Skid system pump and control unit. |
| |
|
|

Skid shoe jacks at mid stroke. |
|

Cranes passing. |
Middle Point Coal Terminal

Ro-Ro ramp arrangement during discharge. |
 |

Setting the pivot. |
| |
|
|

Completing discharge. |
|

Completion of shiploader installation. |
| |
|
|

Setting shiploader over pivot. |
Sechelt Deep Sea Terminal
Crane

Relocating shipyard crane from North Vancouver to Fraser River. |
 |

Offloading shipyard crane. |
Catamaran Loadout and Launching

1400 tonnes loadout from construction yard to free-floating drydock. |
 |

Dollies under Starboard Hull
|
| |
|
|

Ring module from Vancouver
Shipyards to CFI assembly building. |
back to top
Click here to view these videos of our equipment at work.
For faster viewing "right click" and "save as" to your computers hard drive. Then double click the file and view the video's from your hard drive.
- Cape
Breton - 8.4 megs
- Container
Crane - 10 megs
- Lions
gate project - 21.1 megs
- Pacificat
Modules and Loadout - 11.6 megs
- Module Handling
- 21 megs
Related Links:
www.jensenmaritime.com
www.supremehousemovers.com
www.seabulk.com
|
|
 |